SFO INTERNATIONAL TERMINAL EXPANSION

San Francisco, California
Owner: SFO
Size: 1.8 million sq ft
Project Cost $103.7 million
Major expansion of the San Francisco International Airport. Contract services included all off-site
structural steel fabrication and all on-site structural steel erection for the complete structural steel
package. Structural steel fabrication was performed at multiple facilities including the Herrick Company
(Stockton Steel), San Bernardino Steel, PDM Strocal, Canron Portland and British Columbia, and Corey S.A.
in the State of Jalisco, Guadalajara, Mexico.
ORA was engaged to perform all structural steel fabrication inspections at the Canron New Westminster
facility (British Columbia, Canada), and included all material identification and mill certifications,
welder qualification and certifications, weld procedure specifications (WPS) review and approval, fitup,
preheating and post heating, welding of complete penetration and single/multiple pass welds, nondestructive
testing (Ultrasonic, Magnetic Particle and Liquid Penetrant Methods), high strength bolts and shop
application of two-part epoxy finishes.
ANC TERMINAL C REDEVELOPMENT

Anchorage, Alaska
Owner: City of Anchorage
Project Cost: 103.7 million
Major renovation to the Anchorage International Airport in Alaska. Contract services included all offshore
structural steel fabrication for the complete structural steel package. Structural steel was fabricated at the
facilities of Hyundai Heavy Industries, South Korea. Specific duties include material identification and mill
certifications, welder qualification and certifications, weld procedure specifications (WPS) review and
approval, fitup, preheating and post heating, welding of complete penetration and single/multiple pass welds,
nondestructive testing (Ultrasonic, Magnetic Particle and Liquid Penetrant Methods), high strength bolts and
shop application of two-part epoxy finishes.
SEA AIR TRAFFIC CONTROL TOWER

Seattle, Washington
Owner: Federal Aviation Administration Seattle Center
Project Cost: $26 million
Supporting the FAA Seattle Center air traffic control operations, this project incorporates a complete
replacement airport traffic control tower and the establishment of an administrative base building at Seattle-Tacoma
International Airport. Otto Rosenau & Associates, Inc. was involved in the construction inspection and material
testing of all structural components including: soils, reinforced concrete, glass fiber reinforced concrete panel
fabrication, structural steel fabrication, and other duties.
|