East D
Street Grade Separation and East L Street Bridge Replacement
Tacoma, WA

This $22.5 million
project provides for 0.28 miles of roadway improvements, sanitary sewer,
and waterline updates along with bridge construction. ORA was engaged to
provide testing and inspection services in accordance to WSDOT
specifications. We provided testing and inspection for 42,000 yd3
of backfill material and geotechnical inspections of stone columns,
drilled shafts/caissons, and mechanically stabilized earth (MSE) walls.
Our testing and inspection scope of work also included the following
items:
-
Batch Plant
Inspection – Concrete and Asphalt
-
Hot Mix Asphalt
Paving
-
Soil Bearing
Verification
-
Soil Compaction
-
Pre-Stressed Girder
Fabrication
-
Reinforced Concrete
-
Bolts Installed in
Concrete
-
Ground Anchor
System Inspection
-
Structural Steel
Welding and Details
-
High-Strength Bolts
Owner:
City of Tacoma
|